SEAI Grants + 100% Tax Relief Available

Commercial Solar PV For Logistics Businesses in Ireland

Your warehouse roof could be cutting your energy bills right now. Resolute Group installs commercial solar PV systems for logistics and distribution businesses across Ireland, sized to the daytime load of a working depot. SEAI-certified, with grant funding up to €162,600 and Ireland’s longest maintenance contract.

Grants & Tax Relief

Cut Your Installation Cost with
Grants and Tax Relief

Irish logistics businesses can stack SEAI grant funding with Accelerated Capital Allowance tax relief on qualifying solar PV equipment. Resolute manages the full application end to end, from eligibility checks and paperwork through to ESB connection.

€162,600

SEAI Non-Domestic Microgen

Grant funding of up to €162,600 per site for solar PV systems from 1 kWp to 1,000 kWp under the SEAI Non-Domestic Microgen Grant. Open to logistics and distribution operators.

100%

Accelerated Capital Allowance

Write off 100% of qualifying solar PV equipment costs against profits in Year 1. Stackable with the SEAI grant.

Why Logistics Solar Works

Solar That Matches Warehouse Energy Use

Most warehouses and distribution centres have large, flat roof areas going completely unused. Combine that with high daytime consumption from lighting, refrigeration, conveyors and loading equipment, and logistics buildings become some of the strongest candidates for commercial solar PV in Ireland.

Cut Your Biggest Energy Cost

Irish business electricity is among the most expensive in Europe. A correctly sized warehouse PV system replaces your most expensive imported kWh with self-generated electricity during the daytime hours your operation runs hardest.

Power Lighting, Refrigeration and Conveyors

Distribution centres run continuous loads across large floor areas: high-bay lighting, refrigerated chambers, conveyors, dock levellers and offices. Solar generates most at exactly the hours these systems draw most, so a high share of output is self-consumed rather than exported.

Lock In Your Energy Cost for 25 Years

Grid electricity prices keep rising. Solar gives you a fixed-cost energy source for 25+ years, replacing a volatile operating expense with predictable on-site generation that adds long-term value to the property.

Meet Supply Chain Sustainability Targets

Major retailers and manufacturers now require documented carbon reduction from their logistics partners as part of Scope 3 reporting. A monitored PV system gives you audited generation data to evidence on-site emissions cuts in tenders and customer reviews.

The Resolute Product Difference

Bifacial Panels Built for Working Warehouses

Resolute installs bifacial (glass-on-glass) panels exclusively, sourced from AE Solar and Longi. They generate from both faces, capturing light reflected from bright membrane roofs and surrounding yard surfaces, delivering a higher annual yield per kWp than conventional single-face panels.

For warehouses and distribution centres storing high-value stock, packaging materials or flammable goods, bifacial construction also carries a superior fire-performance rating compared with standard glass-and-backsheet panels. That matters to you and to your insurer.

Trusted Brands
abs supplies img 1 scaled
Engineering Credentials

Ireland's Leading Solar Engineers

Fifteen years installing across Ireland and Northern Ireland, SEAI-certified, and trusted by major distribution operators including Primark, Domino’s Pizza and Meta.

25-Year Maintenance Contract

Every Resolute system comes with the option of a 25-year maintenance contract covering scheduled visits, performance monitoring, inverter checks and component replacement for the full panel guarantee period.

15+
Years Installing
100+
Years Collective Experience
25
Year Maintenance Contract
2
Jurisdictions Covered
Client Roster

Trusted by Ireland's Biggest Energy Users

Testimonials

What Our Happy Customers Say About Us

google reviews with star
5.0

18 Reviews

How We Work

Six Steps from Enquiry to Install

From first call to final commissioning, every step is handled by an SEAI-certified Resolute team member, and your depot keeps operating throughout.

Step 01

Free Assessment

A no-obligation consultation covering your warehouse energy use, building stock and grant eligibility. We come to you.

Step 02

Site Analysis

Physical roof survey, structural assessment, shading analysis and orientation optimisation across your distribution centre or warehouse.

Step 03

Design and Engineering

Custom CAD drawings, energy yield modelling and component specification engineered for your specific load profile and operating hours.

Step 04

Grant Application

We prepare and submit your SEAI Non-Domestic Microgen Grant application and Accelerated Capital Allowance paperwork end to end, including ESB connection.

Step 05

Installation and Commissioning

SEAI-certified installation to the highest industry standards, sequenced around your dispatch schedule with minimal disruption to warehouse operations, and full grid connection.

Step 06

Monitoring and Maintenance

Real-time performance dashboard, scheduled maintenance visits and lifetime support under the optional 25-year maintenance contract.

Case Study

Custom Solutions for Difficult Sites

abs supplies img 3 scaled

Solar PV Installation at ABS Building Supplies

Resolute completed a bespoke solar PV installation for ABS Building Supplies, a company with significant electricity usage driven by busy yard operations and a large vehicle fleet. The project was designed to offset energy costs, improve sustainability and support growing demand for clean, renewable energy.

Ground-Mount
Custom Solution
Aerocompact
Mounting System
Custom Design
For Site Conditions

ABS Building Supplies: A Real Resolute Install

Resolute installed a 22.8 kWp rooftop system with 40 kWh of battery storage at ABS Building Supplies. The figures below are modelled from that installed capacity using Irish commercial yield ranges (850 to 950 kWh per kWp per year) and the 2024 average business electricity rate of €0.23 per kWh. Actual performance varies with site, load profile, battery utilisation and grant funding.

22.8 kWp Rooftop + 40 kWh Battery

Annual generation19,000 to 22,000 kWh
Annual electricity savings€4,450 to €5,000
CO2 offset per year5.5 to 6.5 tonnes
Payback period4 to 6 years

Get a project-specific number

Free site assessment from an SEAI-certified surveyor. We handle the grant paperwork.

Logistics Solar FAQs

Frequently Asked Questions

Time on site depends on system size and roof complexity, but we work around your dispatch schedule to keep disruption to a minimum. The full project from first survey to commissioning typically takes 8 to 14 weeks, with the bulk of that being grant processing and ESB connection paperwork. We give you a clear timeline before any work begins.

Savings depend on your building, energy consumption and system size, but logistics facilities with high daytime electricity use tend to see strong returns. Our Domino’s Pizza Distribution Centre install (128.65 kWp) is one reference point at distribution scale. We provide a detailed projection after surveying your site.

The SEAI Non-Domestic Microgen Grant provides up to €162,600 for systems between 1 kWp and 1,000 kWp, and the Accelerated Capital Allowance lets you deduct 100% of qualifying equipment costs in Year 1. You can also earn export credit for surplus electricity sent to the grid. Resolute handles the full application process for you.

Yes. Pairing rooftop solar with fleet EV charging lets vans and trucks charge partly on self-generated electricity, cutting the running cost of an electrified fleet. Resolute designs and installs both, so the system is engineered as one.

Most commercial rooftop solar installations in Ireland do not require planning permission. Exceptions apply for protected structures and conservation areas. We confirm planning status as part of your free assessment so there are no surprises.

With a hybrid inverter and battery storage, your critical loads (refrigeration, security systems, conveyors, IT infrastructure) keep running during grid outages. We size battery capacity to your essential load profile at the design stage.

Our panels carry a 25-year product warranty. Resolute also offers a 25-year maintenance contract covering monitoring, scheduled servicing, inverter health checks, component replacement and rapid-response support for the full life of your system.

Yes. Resolute operates across the Republic of Ireland and Northern Ireland from our Dublin headquarters. Dedicated NI line: +44 28 3073 1007.

Book Your Free Warehouse Site Survey

Five-day turnaround. No obligation. We handle the grant paperwork.

  • SEAI-certified site survey and energy assessment
  • SEAI Non-Domestic Microgen and ACA applications managed end-to-end
  • Custom design matched to your operating hours and load profile
  • Installed and supported by Ireland’s leading commercial PV team
  • 25-year maintenance contract option

Or call us directly.

Get Free Site Survey

Request your free site survey below. Our team will assess your site and come back to you soon.