Solar for Schools Programme: Fully Funded

Solar Panels for Schools in Ireland

Electricity costs are rising and school budgets are feeling it. Resolute Group installs fully funded solar PV systems for primary, post-primary and special schools across Ireland under the Solar for Schools Programme. We handle everything from site assessment and quotation to funding paperwork and installation.

Government-Backed Funding

Government-Backed Solar for
Every School

The Solar for Schools Programme is funded by the Government’s Climate Action Fund and run by the Department of Education with SEAI support. Eligible schools receive up to 6 kWp of roof-mounted solar PV, a monitoring system with display screen, and grid connection at no cost, installed by a contractor on the SEAI Non-Domestic Microgen register, which is exactly where Resolute sits. We manage the full application on your behalf.

Fully Funded

Solar for Schools Programme

Up to 6 kWp of roof-mounted panels (around 14 panels), a monitoring system with display screen and grid connection, at zero cost to eligible primary, post-primary and special schools.

€162,600

SEAI Non-Domestic Microgen

Schools with larger buildings or higher energy demand may be able to access additional support through the SEAI Non-Domestic Microgen Grant. Eligibility depends on the site and any prior funding, and we confirm it during your assessment.

Why Solar Suits Schools

The School Day Maps Perfectly Onto Solar Generation

Schools run during the hours when solar panels generate the most energy. Between 9am and 4pm, most of the electricity your system produces is used on-site to power classrooms, IT equipment, lighting and heating. The real advantage comes when the building is empty: weekends, mid-term breaks and the full summer holidays. Your panels keep generating, and that energy flows back to the grid, earning the school income.

Lower Electricity Bills

Your school generates its own power during peak teaching hours, reducing what you draw from the grid. The Department of Education estimates a 6 kW system saves a school in the region of €1,200 to €1,600 per year, including export credit.

Weekend and Holiday Income

When the building is closed, your panels keep working. Every kilowatt-hour exported earns the school credit. Few building types combine high daytime use with months of unoccupied export time the way a school does.

Live Energy Monitoring

Students and staff track the school's generation in real time on the included display screen. The monitoring system turns your roof into a working lesson in renewable energy for the whole school community.

Stronger Carbon Reporting

A solar PV system reduces your school's carbon footprint from day one, supporting the sector's Climate Action Plan targets and strengthening Green Flag submissions.

The Resolute Product Difference

Bifacial Panels Built for School Buildings

Resolute installs bifacial (glass-on-glass) panels exclusively, sourced from AE Solar and Longi. They generate from both faces, capturing light reflected from roof surfaces and surrounding hard standing, for a higher annual yield per kWp than conventional single-face panels.

Bifacial construction also carries a superior fire-performance rating compared with standard glass-and-backsheet panels. In a school environment where safety is the first consideration, that rating matters.

Trusted Brands
Stepaside School Intsalll
Engineering Credentials

Ireland's Leading Solar Engineers

Fifteen years installing across Ireland and Northern Ireland, SEAI-certified, with delivered school installs including a 31.54 kW system at Stepaside School in Dublin, Drinan National School and Naas Community College.

25-Year Lifetime Maintenance

Every Resolute system comes with the option of a 25-year maintenance contract. No other installer in the Irish market offers this. Scheduled maintenance, performance monitoring, inverter checks and component replacement covered for the full panel guarantee.

15+
Years Installing
100+
Years Collective Experience
25
Year Maintenance Contract
2
Jurisdictions Covered
Client Roster

Trusted by Ireland's Biggest Energy Users

Testimonials

What Our Customers Say

google reviews with star
5.0

18 Reviews

How We Work

Six Steps from Enquiry to Install

We manage the full process so your team does not have to. From first call to the 25-year maintenance contract, every step is handled by an SEAI-certified Resolute team member.

Step 01

Free Assessment Call

No-obligation initial consultation to confirm your school is eligible for the Solar for Schools Programme and to schedule a site assessment.

Step 02

Site Assessment

We visit your school to assess the roof structure, electrical systems and panel orientation. This tells us exactly what your building can support and what the expected output will be.

Step 03

System Design

We design a solar PV system sized to your school’s energy profile. Every system is engineered for the specific building, not a standard package applied to every site.

Step 04

Funding Application

We prepare the quotation and paperwork your school needs for the Department of Education’s funding approval process, so the office is not chasing applications and approvals.

Step 05

Installation

We schedule installation during mid-term breaks or holidays to avoid any disruption to teaching. Our installers follow strict safety protocols for working on school grounds.

Step 06

Handover & Monitoring

Once the system is live, we walk your team through the monitoring software and hand over full documentation. Your school tracks generation and export income in real time from day one.

Case Study

A Real Resolute School Install

Stepaside School Install

Stepaside School, Dublin

Resolute designed and installed a 31.54 kW solar PV system at Stepaside School in Dublin, sized well beyond the standard 6 kWp programme to match the school’s energy demand. Installation was scheduled around the school calendar, with all on-site work completed safely and without disruption to teaching.

School Campus
31.54 kW
System Term-Safe Install
Scheduled Around Teaching
Custom Design
For the Building's Energy Profile

What Schools Earn Back Each Year

A standard 6 kWp Solar for Schools system can save an Irish school between €1,200 and €1,600 per year, according to Department of Education figures, including both reduced electricity costs and export credit. The figures below model a larger 31.54 kW install like Stepaside School, using Irish commercial yield ranges (850 to 950 kWh per kWp per year) and the 2024 average rate of €0.23 per kWh. Actual returns vary with orientation, energy usage and tariff.

31.54 kW · Like Stepaside School

Modelled from installed capacity

Installed capacity31.54 kW (actual)
Annual generation26,800 to 30,000 kWh
Annual electricity savings€6,170 to €6,890
CO2 offset per year8 to 9 tonnes
System lifespan25 years or more

Get a school-specific projection

We confirm projected return after a free site assessment. No cost, no commitment.

Common Questions

Frequently Asked Questions

Most schools do not. Since October 2022, rooftop solar on educational buildings is exempt from planning permission with no area limit, unless the school sits inside one of the 43 Solar Safeguarding Zones near airports and helipads, where a 300m² rooftop limit applies. We confirm your school’s position during the site assessment.

Very little. Solar PV panels have no moving parts and are designed to be low-maintenance. Resolute’s 25-year maintenance contract covers scheduled checks, monitoring and any issues that arise.

Yes. The Solar for Schools Programme covers up to 6 kWp, and schools with higher energy needs can explore additional support through the SEAI Non-Domestic Microgen Grant, subject to eligibility rules around prior funding. We advise on the best route after the site assessment.

Some schools need electrical or roof upgrades before panels can be installed. We identify this during the site assessment and advise on what is needed before any work begins.

This depends on the school and the funding timeline, but most installations are completed within a few months of approval. The physical installation typically takes one to two days on-site.

No. We schedule all on-site work during mid-term breaks, holidays or weekends. If work must happen during term time, we coordinate with school management to avoid any disruption to classes.

Scheduled maintenance visits, real-time performance monitoring, inverter health checks, component replacement and full support for the entire 25-year panel guarantee period.

Yes. Resolute operates across the Republic of Ireland and Northern Ireland from our Dublin headquarters. Dedicated NI line: +44 28 3073 1007.

Book Your School's Free Site Assessment

Five-day turnaround. No obligation. We handle the funding paperwork.

  • SEAI-certified site assessment at your school
  • Solar for Schools Programme paperwork managed with your office
  • System designed around your school’s energy profile and roof
  • Installed term-safe by Ireland’s leading PV engineering team
  • 25-year maintenance contract option

Get Free Site Survey

Request your free site survey below. Our team will assess your site and come back to you soon.